Landau Properties – Electrical Installation & Workshop Refurbishment Project
Wing’s Technical Services completed a large-scale electrical installation and refurbishment project for Landau Properties, delivering upgraded power distribution, containment systems and infrastructure improvements throughout the workshop areas.
The project included the installation of new 20mm metal conduit systems, modifications to existing power circuits, installation of additional socket outlets, relocation of existing light switches and the safe isolation and removal of redundant electrical wiring to suit the new layout requirements.
As part of the electrical upgrade works, our engineers removed the existing single-phase consumer unit and installed a new three-phase consumer unit to provide improved power distribution and increased capacity across the site. New tray work, trunking systems and SWA cabling were also installed to support the upgraded electrical infrastructure.
Additional works included the installation of dedicated supplies for data cabinets, replacement of existing socket outlets with unswitched fused spurs to provide safer and more reliable supplies for equipment, installation of a new external socket outlet, and the addition of a timeclock-controlled feed for external roof lighting.
All works were completed in accordance with current electrical regulations, with full testing and verification carried out upon completion to ensure compliance, reliability and safe operation. The project was carefully coordinated over multiple phases to minimise disruption while maintaining progress within a live working environment.








Our customer service team is here to answer any questions, please use this form or contact us directly via email or phone.

FAQ
What electrical upgrades were completed during the project?
The project included the installation of new three-phase distribution equipment, upgraded power circuits, additional socket outlets, new containment systems and modifications to existing electrical infrastructure to support the new workshop layout.
What infrastructure improvements were carried out?
Works included the installation of new metal conduit, tray and trunking systems, SWA cabling, dedicated supplies for data cabinets and upgraded external power supplies to improve reliability and long-term usability.
How were the electrical systems upgraded?
The existing single-phase consumer unit was removed and replaced with a new three-phase consumer unit, providing improved power distribution, increased capacity and a more modern electrical installation throughout the workspace.
What additional electrical works were included?
Additional works included relocating existing light switches, removing redundant wiring, installing new fused spurs for equipment supplies, external socket installations and timeclock-controlled lighting systems.