Fareham Academy – Full Toilet Refurbishment Project
​
Wing’s Technical Services completed a full refurbishment of the existing toilet facilities at Fareham Academy, transforming outdated areas into modern, safe and fully compliant spaces for daily school use.
The project began with a full strip-out of the existing installations, including controlled asbestos removal in line with current regulations. Internal walls were removed and reconfigured to improve layout, accessibility and overall flow within the facilities.
Our mechanical team carried out complete replumbing works, installing new pipework, sanitary fittings and improved water systems to ensure long-term reliability and efficiency. Alongside this, our electrical team installed new power supplies, modern lighting, emergency lighting systems and upgraded ventilation with new extractor fans to improve air quality and meet compliance standards.
Throughout the project, works were carefully planned around the school environment to minimise disruption, maintain safety, and ensure all areas were left clean, secure and ready for use.
The result is a fully modernised toilet block that enhances pupil experience, improves hygiene, meets current building and electrical regulations, and provides the school with a durable long-term solution.








Our customer service team is here to answer any questions, please use this form or contact us directly via email or phone.

FAQ
What works were included in the Fareham Academy toilet refurbishment?
The project involved a full strip-out, removal and reconfiguration of internal walls, complete replumbing, new electrical installations, upgraded lighting, emergency lighting and improved ventilation systems.
How was asbestos safely managed during the project?
All asbestos was identified, removed and disposed of by licensed specialists in line with current health and safety regulations before refurbishment works began.
What plumbing and electrical upgrades were carried out?
New pipework, sanitary fittings and water systems were installed alongside modern lighting, power supplies, emergency lighting and extractor fans to meet current compliance standards.
How was disruption minimised during school hours?
Works were carefully scheduled, segregated and managed to maintain safety and reduce disruption, ensuring the school could continue operating as normally as possible.